Home Building Process


Since the inception of the company over 2000 homes have been completed. The building process is a large undertaking but is easily managed by our staff. We will listen to your wants/needs and explain the differences between choices.

Please contact us to discuss your next project.

Standard Construction Specifications

  • Building Permit fees in City of Janesville (allowance of $1000.00)
  • Digging and back filling of foundation
  • Poured concrete footings & foundation walls
  • Poured concrete basement & garage walls
  • Poured Driveway and sidewalks as per city code
  • Steel I-beams & support columns
  • Styrofoam sheathing on exterior foundation walls to footer
  • 7’-9” Basement walls with 2×4 treated sill plate
  • OSB roof sheathing w/clips
  • OSB floor sheathing
  • I-joist floor system 16” on centers
  • 2×4 Exterior Walls studs on 16” centers
  • Trussed roof system
  • Styrofoam sheathing on exterior walls
  • House wrap on exterior house walls
  • D4 (Double 4) Vinyl siding (Aluminum fascia & soffit)
  • Ridge vent roof ventilation
  • Soffit vents
  • Architectural shingles or equivalent
  • Aluminum gutters & downspouts
  • R49 blown insulation in ceiling
  • 3 1/2” Batt (R13) insulation in exterior house walls
  • Vinyl windows (allowance)
  • Hollow core interior doors / 3 panel
  • 2 ¼ casing and 3 ¼ base
  • All interior walls (1 coat) & exterior trim painted
  • Insulated steel entrance doors
  • Mirrors over bath vanities
  • Cultured Marble Vanity Top(s) with sinks
  • Mansfield toilets or equivalent
  • Fiberglass shower module
  • Kohler Chrome faucets or equivalent
  • Toilet paper holders and towel bars to match door hardware trim
  • Double bowl kitchen sink
  • Laminate countertops in kitchen (allowance)
  • 40-gallon gas water heater
  • Hose bibs & standpipe for washer
  • Floor drain in basement
  • (2) Exterior frost-free hose bibs
  • Electric outlets for stove & dryer (gas Extra)
  • Vent for dryer
  • Cabinets (allowance)
  • Flooring (allowance)
  • Lighting Fixtures (allowance)
  • Plumb for water softener
  • Forced air gas furnace
  • Supply and return registers in all bedrooms
  • Locking knobs on bedrooms & bath entry doors
  • Smoke detectors wired per code
  • Round Schlage locks (finish to match hardware)
  • Uninsulated overhead garage door(s)
  • Fine grade and seed of disturbed area
  • All clean-up of home while under construction
  • All insurance and utilities while under construction
  • Full one-year Builder’s warranty